|
v |
Site
survey and preparing the shop drawings. |
|
v |
Making of pilotholes in pavements, streets and gardens for Manholes,
Cabinetholes, Conduit System and Cabinet bases. |
|
v |
Digging of construction pits for Manholes, Cabinetholes and Cabinet
bases as well as trenches for Conduit System. |
|
v |
Prefabrication of Concrete parts as Manholes, Cabinetholes, Cabinet
bases, etc... with the accessories according to the customer
specifications. |
|
v |
Casting in site the concrete parts when necessary. |
|
v |
Transport and dropping the concrete parts. |
|
v |
Digging of conduit system and secondary
routes in all type of soil including preparing the jointing
pits for the secondary cable splicing. |
|
v |
Supply and laying of PVC-Pipes 110 mm diameter. and 55 mm diameter
as well as its accessories as bends, spacers, etc. |
|
v |
Laying of secondary cables in trenches as well as pulling in
PVC-Pipes. |
|
v |
Re-leveling of cover frames of Manholes to the new street levels. |
|
v |
Repairing the damaged PVC-Pipes in the existing routes and
calibrating and inserting the Nylon rope inside the repaired pipes. |
|
v |
Executing of all the particular crossings for the primary and
secondary networks like :
- Road crossings using the drilling / pressing method.
- Railway crossings using the drilling / pressing method.
- Bridge attachment using galvanized steel pipes.
- Canals / Drainages crossings using the P. E. endless pipes.
- River
crossings using the submarine cables.
|