|
v |
Site survey for the new link, new area and existing route
including collecting the data. |
|
v |
Establishing all of the maps with AutoCAD System. |
|
v |
Design the transport link or FTTX network according to the
requirements of the customer and collect the approval. |
|
v |
Preparing the B.O.Q. |
|
v |
Supply all the fiber optic accessories, such as cables, ODF,
pigtails, and FTTX solution GPON & GEPON,… etc. |
|
v |
Assisting efficiently in getting the required permissions as
well as the organization protocols with all the concerned
utilities. |
|
v |
|
|
v |
Pulling the fiber optic cables between the exchanges or between
exchange up to Optical Network Unit (ONU) or remote cabinets by
using all pulling tools such as winch, Unimog Mercedes, etc. |
|
v |
Protection of fiber optic cables inside the manholes and
handholes to avoid any damage that may happen inside these
manholes and handholes. |
|
v |
Installation passive and active components for FTTX solution (OLT,
ODF, closures, splitters, cabinets, ONUs…etc.) |
|
v |
Splicing fiber optic cables by using fusion splice machine. |
|
v |
Termination inside the exchanges to connect the fiber optic
cables with pigtails inside ODF and also inside the ONU and
remote cabinets. |
|
v |
Measurements the complete system and links by
using OTDR, power meter and light source. |
|
v |
Handing over hard and soft copies for the
measurements sheets provisional certificates for the customer. |
|
v |
Preparing the balance of materials for all the received and used
materials. |